Oil Press Maintenance

Oil Press Maintenance
(A) After 50 hours of each job should check lubrication, the slowdown in oil blank box above may not be lack of oil, pressing bolts screw shaft bearings adjust adjust a screw hole add butter, no dry mill.
(B) The site should be lubricated to prevent intrusion of dust and other debris, slowing me each year to check the quality of the oil once, such as found in metamorphic, should be replacing all the oil.
(C) When the production of lower oil a cake or abnormal, the screw should be pressed out to check pressing bolts, pressing, the cake out of the mouth of wear, to the timely replacement of worn-out parts.
(D) After the end of the class work should be to remove the residual cake machine, clean the machine surface dust, grease stain.
(E) The production of long-term storage at the end of the season, there should be a maintenance and screw pressing, pressing, the cake out of the mouth should be unpicking and washing and re-painted oil, then on dry place.

Leave a Reply